This is the start. I don't have any pics of before the dirt work but he moved lots of dirt to make the pad. He took seven feet off one side and added it to the other. This pic is the view of the pond. I should tell you that this project started may of 2012 and is still under construction. It's a 60x80 building with a 40x60 building off the side. The 40x60 is my house and wife's garage. The 60x80 is going to be split up and have a shop, a man cave and storage.