aggie91
Well-known member
Well I started this whole process back in early April. We started framing this morning.
After researching what I wanted the building to be and what size I was comfortable with in the yard I have, I elected to do a 24' wide, 30' deep, 12' tall Pole Barn with one 10x10 roll up door and one man door. The slab will be 4" concrete with 3/8" rebar on 12" or 16" centers both ways. Not sure on the spacing right now.
I chose Ark-La-Tex Builders to do the building. I looked at quite a few others and they had the best price for the specs I was looking at on the building. 5 Starr was another I looked at too. Terry Fuller is the sales rep that I am working with. He has been real easy to deal with. We went over the contract and the specs and he answered all my questions at that time. He told me once I had my Pad ready, I would be put in line for construction. Once the pad was ready, we would do the contract and get the colors and door locations finalized.
I had to do some dirt work in my yard for the pad. With my luck, it started raining the same week I met with Terry. I ended up bringind 36 yards of dirt for the pad. Lucky for me, I do business with a local contractor with my day job, so he was able to cut me a deal on getting the dirt hauled and delivered to my house. My oldest son's best friend has a nice tractor with a bucket and a box blade, so he got the job to do the dirt work with my direction/supervision. Here are some pictures of the pad work:
Got started cutting the driveway back to the shop that will run down one side, its about 10' wide. We used that dirt to start filling in the low spots.
Then the rains started...Over the rest of April and all of May we would work a day or so between rains and getting dirt delivered...Finally, during Memorial day weekend we made the last push to finish the pad and did some packing and rolling during the last week of May. Called Terry and he and I got together and signed the contract on June 1st to get me in line...5-7 weeks out to start...
Here is what I looked like yesterday and for the last 6 weeks:
Thanks for looking!
After researching what I wanted the building to be and what size I was comfortable with in the yard I have, I elected to do a 24' wide, 30' deep, 12' tall Pole Barn with one 10x10 roll up door and one man door. The slab will be 4" concrete with 3/8" rebar on 12" or 16" centers both ways. Not sure on the spacing right now.
I chose Ark-La-Tex Builders to do the building. I looked at quite a few others and they had the best price for the specs I was looking at on the building. 5 Starr was another I looked at too. Terry Fuller is the sales rep that I am working with. He has been real easy to deal with. We went over the contract and the specs and he answered all my questions at that time. He told me once I had my Pad ready, I would be put in line for construction. Once the pad was ready, we would do the contract and get the colors and door locations finalized.
I had to do some dirt work in my yard for the pad. With my luck, it started raining the same week I met with Terry. I ended up bringind 36 yards of dirt for the pad. Lucky for me, I do business with a local contractor with my day job, so he was able to cut me a deal on getting the dirt hauled and delivered to my house. My oldest son's best friend has a nice tractor with a bucket and a box blade, so he got the job to do the dirt work with my direction/supervision. Here are some pictures of the pad work:
Got started cutting the driveway back to the shop that will run down one side, its about 10' wide. We used that dirt to start filling in the low spots.
Then the rains started...Over the rest of April and all of May we would work a day or so between rains and getting dirt delivered...Finally, during Memorial day weekend we made the last push to finish the pad and did some packing and rolling during the last week of May. Called Terry and he and I got together and signed the contract on June 1st to get me in line...5-7 weeks out to start...
Here is what I looked like yesterday and for the last 6 weeks:
Thanks for looking!