Teamchevy's Garage/Shop Build

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Well, the work has begun today on my new garage/shop. It's 34' wide, 24' deep, 10' high. It has a single insulated 16' x 8' door, a 36" insulated pedestrian door and 3 windows.

Here's the site plan:
GarageSitePlan.jpg


Here's the layout, still working out details for the shop area:
GarageLayout.jpg


Saturday the site was staked out:
Garage1.jpg


Today they came, opened up the fence, put up the silt fence and sprayed the outline for the driveway and walls:
Garage2.jpg


Excavator to come on Wednesday, formed & filled by Friday, concrete Monday? I hope?

Dave
:canada2:
 
To avoid these ads, REGISTER NOW!
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Wednesday: Excavation, driveway & fill, plus ditch for hydro & gas! I know how much you all like pictures, so I asked my better half take some while I was at work ;) !!

Dave
:canada2:

Garage4.jpg


Garage6.jpg


Garage14.jpg


Garage8.jpg


Garage16.jpg


Garage19.jpg


Garage24.jpg
 

aqr81

Well-known member
Joined
Jul 20, 2010
Messages
1,127
Location
Central Valley, Ca.
Off to a great start in a very nice setting with the trees and river behind. Will look very nice when done. Keep us advised on your progress.
 

mad57

Well-known member
Joined
Jan 30, 2009
Messages
1,698
I love the smell of fresh dirt in the morning and progress!!!!
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Not too much to update today. Guys were back to lay in the mesh and backfill the form. If the weather hangs in, concrete gets poured Monday!:D Gas guys ran a new pipe from the valve around the back of the house and tied into the poly pipe. The electrician mounted the conduit and ran the tech cable from the slab form, in the trench, and into the house. That's pretty much it until Monday!:)

Dave
 

nmanitou

Well-known member
Joined
Mar 17, 2009
Messages
221
Location
Michigan
Enjoy! Looks great so far. I am just completing my build and appreciate the excitement and joy of seeing the progress every day. Keep the pics coming
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Update for Oct 5

The concrete crew came back this afternoon, stripped off the forms and cut the floors. The shingles and windows were aslo dropped off. Framing to start tomorrow or Thursday! :D

Dave
:canada2:

Garage45.jpg


Garage46.jpg


Garage47.jpg


Garage48.jpg


Garage49.jpg
 
To avoid these ads, REGISTER NOW!

FarmerSid

Well-known member
Joined
Dec 12, 2005
Messages
145
Location
Ontario, Canada
I could hardly sleep at nights when I built back in'06 cause I was always thinking of what I was going to do in my shop. Looks great!! Nice to see another from Ontario. I'm about 1.5 hrs east of you.
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
I could hardly sleep at nights when I built back in'06 cause I was always thinking of what I was going to do in my shop. Looks great!! Nice to see another from Ontario. I'm about 1.5 hrs east of you.

Hi FarmerSid!! I've been the same way this week! Nice to hear from someone "local" as well! :hellobye:

Dave
:canada2:
 

Nighttrain

Well-known member
Joined
Aug 6, 2009
Messages
2,682
Location
Dripping Springs, Tx
Very nice! ? how deep did they saw the cement? Looks like on the side it's very deep or is that just over the side cut? I did not have my slab cut and wished I did as the cracks go all the way across the floor.

Keep us posted and congratulations on the garage after a 24 year wait. Enjoy it!
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Very nice! ? how deep did they saw the cement? Looks like on the side it's very deep or is that just over the side cut? I did not have my slab cut and wished I did as the cracks go all the way across the floor.

Keep us posted and congratulations on the garage after a 24 year wait. Enjoy it!

Thanks Nighttrain! Looks like it's a 4" cut.

Dave
:canada2:
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Update for Oct 9

Trusses & sheathing were delivered, trusses were put into place. That's it until Tuesday as it's our Thanksgiving this Monday!

Dave
:canada2:

Garage65.jpg


Garage66.jpg


Garage67.jpg


Garage68.jpg


Garage69.jpg


Garage71.jpg
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Update for Oct 12

The boys were back at it after a long weekend. Framing complete, sheathing and tyvek on, windows & pedestrian door installed. Roofers to come tomorrow!

Dave
:canada2:

Garage72.jpg


Garage73.jpg


Garage74.jpg


Garage75.jpg


Garage76.jpg


Garage77.jpg


Garage78.jpg


Garage79.jpg


Garage80.jpg
 

787B

Well-known member
Joined
Sep 16, 2010
Messages
294
Location
Baltimore, MD
That garage floor is filthy, Dave. Looks like mine, except I have doors so no excuse... :D

That's going to be a very nice space. I'm jealous!
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Update for Oct 14

No new pictures today..:( Rained all day long. Did meet with the electrician, he's going to try & come back on Monday to start installing the panels! :D Might have power before the end of next week!! :)

Dave
:canada2:
 
OP
T

Teamchevy

Well-known member
Joined
Nov 4, 2009
Messages
139
Location
Peterborough, Ontario
Electrical Layout

Well, I think I have most of my electrical layout done for now. Enough to get using the shop.:D About 16 outlets, 14 F32T8/TL841 32 Watts Fluorescent Lamps, a ceiling fan, over head outlet for the door opener and a drop down cord, Compressor (still not sure of the location), natural gas heater and future 220V welder (someday ;) ).