Hi Fellas,
My garage floor has become BADLY PITTED/FLAKING due to the attack of melting road salt that is brought in by the wife's car every winter. My garage is not heated so it doesn't get hosed out until late Spring, which allows the salt to lay there for weeks/months to eat on the concrete surface.
What do you think of this idea:
I was thinking of renting a floor grinder and grinding the surface down ~1/2" (in May or June), then laying a cap of concrete 2" at the outer walls and sloping toward the center. I may install a simple crock drain grate (gravel dry well type) at the floor center. Then seal the entire floor with an epoxy, maybe like, U-Coat-It. I would hope then that the tracked in road salt next winter would melt/drain/run toward the center of the floor under the car (rather than toward the outside walls, corroding everything that's metal along the way!) and NOT destroy the floor's surface in the process.
Is that a feasible plan?
Do you think it would last for 5+yrs?
Does anyone have a better idea/suggestion?
Thanks in advance for any & all advice, opinions or suggestions!
Ryan W
My garage floor has become BADLY PITTED/FLAKING due to the attack of melting road salt that is brought in by the wife's car every winter. My garage is not heated so it doesn't get hosed out until late Spring, which allows the salt to lay there for weeks/months to eat on the concrete surface.
What do you think of this idea:
I was thinking of renting a floor grinder and grinding the surface down ~1/2" (in May or June), then laying a cap of concrete 2" at the outer walls and sloping toward the center. I may install a simple crock drain grate (gravel dry well type) at the floor center. Then seal the entire floor with an epoxy, maybe like, U-Coat-It. I would hope then that the tracked in road salt next winter would melt/drain/run toward the center of the floor under the car (rather than toward the outside walls, corroding everything that's metal along the way!) and NOT destroy the floor's surface in the process.
Is that a feasible plan?
Do you think it would last for 5+yrs?
Does anyone have a better idea/suggestion?
Thanks in advance for any & all advice, opinions or suggestions!
Ryan W