For this guy a 60 will be sufficient and likely wont effect the rest of the house, its a simple cable job and likely short. We assume its an attached garage, run it to a 100A main lug panel with 6 spaces, no main needed and its cheap, connect a couple outlets from it, a 240 and couple 120's for running tools and you are good to go. Lots of welding machines now only calling for 20A service.
Different setup than places where labor is hi, runs are long and piping is needed and owner lives in the shop with gobs of power tools, ac and possibly constant air compression. Then 100A or better. Most home garages add very little to the demand factor as the use is so intermittent.