To avoid these ads, REGISTER NOW!

Adding Plumbing to Existing Building

TX63CONV

Well-known member
Joined
Sep 14, 2010
Messages
311
Location
Dallas, TX
Looking at a property that has a 30x50 metal building with a mezzanine on the short gabled side. I would like potentially build an office and bathroom upstairs but would need to add plumbing. Anyone gone in after the fact and can share some photos of how they accomplished this? Would be running to a septic but that is another thread.
 
To avoid these ads, REGISTER NOW!

dcg9381

Well-known member
Joined
Jun 20, 2018
Messages
11,708
Location
Austin, TX
Looking at a property that has a 30x50 metal building with a mezzanine on the short gabled side. I would like potentially build an office and bathroom upstairs but would need to add plumbing. Anyone gone in after the fact and can share some photos of how they accomplished this? Would be running to a septic but that is another thread.
Not sure what you want. As the office / bath is upstairs, you've just got to get water in and water out. I did it before the fact by putting conduit and a 3" drain line in all the corners. For water, I just run 3/4" PEX through the electrical sleeve. But you can do it after the fact by adding a water main and drain on the side of the building through the steel. You'll need a "vent solution" for any drain, but that's easy.

Standard P-traps and slope designs apply, but you've got an upper floor, so should be easy.

My only hesitation would be "cold climate" where an exterior water line will likely freeze. You're in DFW, it'll happen, but not very frequently and if you use PEX, nothing is going to blow up.

I don't know DFW septic regulations, but down here in central Texas the one thing I cannot do is tap an existing septic and add beds/baths without a full engineering deal and redesign. And if I do it "anyway" it's all good until resale, where they WILL catch it.

1781639370240.png
 
OP
T

TX63CONV

Well-known member
Joined
Sep 14, 2010
Messages
311
Location
Dallas, TX
Thanks! pic above with drain, vent and water supply would be ideal if starting from scratch. Understood, I have lots of room to work since bathroom would be located upstairs.

What I was hoping to see was someone who has run the drain and supply on the 'outside' of the building. Is the other alternative to hammer out the concrete and run supply/drain under the slab--I would like to avoid this.

Actually relocated to Florida recently but similar wild west here--septic and well would need to be added.
 

manwithtools

ALLIANCE MEMBER
Joined
Aug 24, 2015
Messages
13,744
Location
Lebanon, TN
I don't know DFW septic regulations, but down here in central Texas the one thing I cannot do is tap an existing septic and add beds/baths without a full engineering deal and redesign.
In many jurisdictions the septic system requirements are driven by the number of bedrooms only. You could have 12 bathrooms in a three bedroom house and the septic requirements would not change. When I built my shop and included a full bath and laundry setup, no septic permit or inspection was required because I did not add a bedroom.
 
To avoid these ads, REGISTER NOW!

dcg9381

Well-known member
Joined
Jun 20, 2018
Messages
11,708
Location
Austin, TX
What I was hoping to see was someone who has run the drain and supply on the 'outside' of the building. Is the other alternative to hammer out the concrete and run supply/drain under the slab--I would like to avoid this.
I'd assume you just run a 3" drain line out the side of the building and immediately attach a 90. Someone else will have to hammer you on if this meets code... but you see this stuff all the time in the big city.

1781644792045.png

In many jurisdictions the septic system requirements are driven by the number of bedrooms only. You could have 12 bathrooms in a three bedroom house and the septic requirements would not change. When I built my shop and included a full bath and laundry setup, no septic permit or inspection was required because I did not add a bedroom.
I get it. I don't know the septic design requirements if it's sinks, baths, sqft, whatever. I do know that here if you connect "anything" that wasn't in the original permit, they send you back to a septic engineer who is required to follow "current code". It's one of the biggest "sales gotchas" here. You literally sign a form that makes you liable for any deviation from the original design/permit at the time of sale.... In perpetuity.
 

larry4406

Well-known member
Joined
Jan 27, 2006
Messages
19,148
Location
Northern Virginia
I'd assume you just run a 3" drain line out the side of the building and immediately attach a 90. Someone else will have to hammer you on if this meets code... but you see this stuff all the time in the big city.

1781644792045.png
We do this inside, and if there are no ground works below the concrete slab, we call it a hung sewer. Post 2.
 

dcg9381

Well-known member
Joined
Jun 20, 2018
Messages
11,708
Location
Austin, TX
we call it a hung sewer. Post 2.
How's that work in the winter? OP is in DFW, but we got some ****** weather a few years back and I froze 3" drain lines on an RV solid... There is no frost level in TX,but I'd just as soon go outside with a single 90 then drill a slab with steel in it.
 

larry4406

Well-known member
Joined
Jan 27, 2006
Messages
19,148
Location
Northern Virginia
How's that work in the winter? OP is in DFW, but we got some ****** weather a few years back and I froze 3" drain lines on an RV solid... There is no frost level in TX,but I'd just as soon go outside with a single 90 then drill a slab with steel in it.
Because its inside and you heat the place...
 
To avoid these ads, REGISTER NOW!
Top Bottom