To avoid these ads, REGISTER NOW!

Almost done

ketas47

Well-known member
Joined
Jan 19, 2010
Messages
90
Location
Beaver Dam Wis
Started to rip down old garage in April of 2008 New garage outside finished August 2008. Most of work done by myself and wife. The sight prep done by my brother and concrete by my cousin and framing with the help of brothers and friends.Pretty much put up without hiring professionals except the electical service. Demensions: 26'x38'x10',2"x6"walls 2 10'x8'over head doors, 1 service door and 3 windows 36"x36" Fully insulated, infloor heat with a navien on demand water heater. Only thing I need to do is put VCT on the floor this spring
 

Attachments

  • 100_1185.jpg
    100_1185.jpg
    141.4 KB · Views: 53
  • 100_1225.jpg
    100_1225.jpg
    152 KB · Views: 59
  • 100_1236.jpg
    100_1236.jpg
    150.4 KB · Views: 88
  • IMG_0298.jpg
    IMG_0298.jpg
    140.5 KB · Views: 56
  • IMG_0294.jpg
    IMG_0294.jpg
    131 KB · Views: 74
  • IMG_0293.jpg
    IMG_0293.jpg
    137.9 KB · Views: 101
  • IMG_0295.jpg
    IMG_0295.jpg
    137.3 KB · Views: 88
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
Top Bottom