Tarheel Slim
Well-known member
Im pouring a small pad in front of my garage door,i would like some tips on finishing the concrete ,i plan to use a 2x4 to float or get my concrete level,then i was just going to edge it,should i broom finish the surface that will be leveled by the 2x4 or can i just leave it alone and just edge it,i also have a expansion and contraction strip to put between the new pad and the garage concrete floor.I need to know the right working time ,its going to be 5 degrees celsius or 41 degrees ferinheight tomorrow morning,is this ok weather for my 9x12 pad,was going to do it today but with rain in the last 2 days,they let me cancel and move the truck to tomorrow morning,any and all advice is appreciated.