I'm transitioning from underground schedule 80 CPVC to IMC with compression fittings as the 30 foot conduit run emerges from the ground to connect to my pedestal. Can I make the transition under ground, do I need to tape the coupling? Or do I have to emerge from the ground with the PVC?