cyamaha2007
Well-known member
The quick and short im wondering why the change in the code for services. It used to be 3 wire from the service disconnect to your panel and a bonded neutral/ground also a ground rod was placed near the panel. What benifits does this new rule carry? Also lets say you have a 400a meter feeding a 200a panel in your house its a old style. Now say i add another panel to be fed off the same meter in a outbuilding, can that new panel be the 4 wire setup and not interfere with the house 3 wire setup. Or does the the house need to be upgraded to the 4 wire setup?
Thanks alot Chuck.