Here"s how install chain link fence in SE Ga . First GET A DIG PERMIT( PERMIT IS NOT GOOD until 72 HRS AFTER YOU CALL IN, ASK QUESTONS, IN GA THEIR MARKS HAVE A HALO OF 18IN ON EITHER SIDE . The utilities will mark their services to the meter,or, if the service runs thru your yard which is a utility easement, they will NOT mark after the meter[example if you have a gas line to your house, the line may continue after the meter and if you cut it ,its your repair bill]

Tools you will need, hole digger , lineman's pliers,ratchet strap or come along,string,pull-bar,1/2 , and9/16 if you have gates, Start with your terminal (2 1/2in post)at all ends and corners,example is 4ft is set set at 48 in unless you have 3 terminations than it needs to be 48 3/4in . Now i'll prob get flamed but i have been installing fencing full-time for 6 yrs .

Dig your holes 20 in deep gently tap post with bfh not a little hammer I use a 2lb sledge till you reach 48 in, fill hole half full with water slowly dump#40 of quickreet or sakrete then plumb post kick dirt till the hole is above grade ,then pack the dirt down until its packed re plumb then take water hose and rinse off post and wet the dirt down around the post hole then replumb. Next set post on the other end. Next step , run string about 6in to 2 ft high. Next step measure how long the run is, example 98ft recommendation is under 10ft between posts =9ft 8in is what i mark the location of holes using the string as a straight edge. Next step, move string and dig holes for the line posts( 1 5/8in)at 22inches deep. Next step set string(using our hypothetical 4ft fence as example) on outside of term post at 45 in high set your center post using above method 49ft at 45 in ,or if you have a crown in your yard set the post at the peak still at 45in clamp the string on that post then work away by 1/2s 98 ft 49 ft 19ft 6in if in doubt walk along with measure from ground to string set all posts, let concrete dry for at least a day. Next step install brace bands 3 on 4ft 4 on 5ft 5 on 6ft orienting the flat side out , if its a corner alternate them, 4ft gets 3 bands 1 way and 3 the other way .Next install top rail to make it easier always pull downhill if you can so you would start at low end with female in rail end cap and male pointing uphill installing all bolts and bands as you go. To save on materiel when you get to the end use the cutoff as a starter for the next run . Next roll out mesh and lace ( when lacing you need a male side and female if it has a male on top it will have a female on the bottom or vice versa to fix take out 1 link or flip 1 side) links together on the ground . Next flop mesh up to term post and temp tie to top rail, then drop tension bar in place and install 1 tie on top rail per section9ft 8in if you started from the left install tie on the rightside of eye top on linepost continue to the end. Next drop a tie bar in mesh about 8 ft from end , hook come-along or ratchet strap to puller to tiebar . Next ratchet until you have a slight amount of tension, then walk along and sight the top of the mesh is in a straight line . If there is a concave between ties and you pull it will always be there,so pick up center of concave and see if it stays up ,if not add a little tension, keep alternating pull then lift then go back another section. it's tight when you hit the side and a wave goes all the way to the end ,careful and don't bend the term post

Next step cut mesh to length ,drop in tie bar and install 1 tie halfway between term and your pull tie bar slowly take pressure off the puller and install ties every 2-3ft on top rail and posts and your done .

If you do gates 4ft is exactly 4ft between terminal posts.