I had a 20x45 concrete pad poured last week. The pad had footers with rebar thoughout the pad. Also 10 yards of gravel and 20 yards of concrete. the bid included 50 feet of 4' sidewalk. The cost was around $6000. I have about 20x95 of gravel driveway left that the concrete guy gave me a price on to complete. I called a asphalt guy out of a qoute as well. The driveway is flat with 3" of gravel both qoutes included excavation for proper sloping. To my surprise the ashalt guy was'nt that much less than the concrete guy about $1000. Has asphalt got more expensive or am I getting the "I really don't want to do it price" We do live about 25 miles out so I am sure I am getting travel figured in to the price.
I did the concrete ashalt thing at my last house (10 years ago) and found ashpalt about half of what the concrete cost.
Any thoughts?
I did the concrete ashalt thing at my last house (10 years ago) and found ashpalt about half of what the concrete cost.