Hay,
We are converting a dairy barn to a shop and have two gutters about 5.5 inches deep that need to be filled with concrete. We were wondering if we could cut our costs a bit and put some gravel down first.
Any opinions on how deep we need the concrete? Could we get away with a couple of inches of gravel first?
Thanks.
We are converting a dairy barn to a shop and have two gutters about 5.5 inches deep that need to be filled with concrete. We were wondering if we could cut our costs a bit and put some gravel down first.
Any opinions on how deep we need the concrete? Could we get away with a couple of inches of gravel first?
Thanks.