jabingham81
Member
- Joined
- May 4, 2017
- Messages
- 12
Concrete is getting poured in a week. 24x32x12 is the size. One end of the building is going to have a drain and wash area. I am worried about the epoxy being slippery when wet. What are your thoughts? Might just do the work area in front of the wash area that will be 24x24.
