HEy guys,
So, when I poured my floor I formed up the trench drain (1'x24') and just left the inside without concrete (due to the way I formed it)
Looking for advice now that its time to pour the floor in the drain.
How do I get a good bond? Should I calk the sides with something to prevet moisture from getting under my slab? How thick should I pour it?
Any help is appreciated!
Pics of the form work are in my sig.
So, when I poured my floor I formed up the trench drain (1'x24') and just left the inside without concrete (due to the way I formed it)
Looking for advice now that its time to pour the floor in the drain.
How do I get a good bond? Should I calk the sides with something to prevet moisture from getting under my slab? How thick should I pour it?
Any help is appreciated!