So going to be installing VCT on my garage floor, thanks to the info I found on this site. I have a poured concrete drive way with about a 2" gap between that and garage floor. This gap is right where my garage door comes down and goes into.
I want to get the rubber thresholds to make a better seal, as well as finish off the edge of the VCT at the garage door opening.
Question is, should I just fill that gap in with sand or something? This way concrete can still expand, but provide a base for the rubber threshold to sit on so there is no gap under neath?
Thanks.
I want to get the rubber thresholds to make a better seal, as well as finish off the edge of the VCT at the garage door opening.
Question is, should I just fill that gap in with sand or something? This way concrete can still expand, but provide a base for the rubber threshold to sit on so there is no gap under neath?
Thanks.