I am torn between some flooring options. I am in Florida. 390sq feet

I have had 2 presentations:
First:
$2,300.00 - 1 Day
1) Diamond Grinding & Prepping
2) Repair. Cracks repaired with industrial grade 100% Solids Epoxy Instant Patch Filler. Product = SIMIRON 1100SL
3) Apply 100% SIMIRON Solids MVB (Moisture Vapor Barrier) Epoxy Base Coat. MVB Epoxy will withstand 12-14lbs of hydraulic pressure. Florida is known for seasonal moisture issues that occur. A Moisture Vapor Barrier as a primer is HIGHLY recommended in order to prevent stains of moisture underneath the coating.
4) Full Flake
5) Scrape
6) Polyaspartic top coat - Simiron Polyaspartic HS
* All outdoor areas coated include an additive of Aluminum Oxide for enhanced "Anti Slip" Resistance*
7)15 year warranty
$2,700.00 - 2 Day- claim MVB makes it a 2 day project
1) Diamond Grinding & Prepping
2) Repair.
3) Apply MVB
4) Polyurea Base/Primer
5) Full Flake
7) Polyaspartic top coat
8)Lifetime warranty
First guy is saying 1 day is fine. second guy is saying MVB always requires 2 days. One can start next week. Two needs a month because of the 2 day issue. Two is also saying polyurea base is better.
I am torn between some flooring options. I am in Florida. 390sq feet

I have had 2 presentations:
First:
$2,300.00 - 1 Day
1) Diamond Grinding & Prepping
2) Repair. Cracks repaired with industrial grade 100% Solids Epoxy Instant Patch Filler. Product = SIMIRON 1100SL
3) Apply 100% SIMIRON Solids MVB (Moisture Vapor Barrier) Epoxy Base Coat. MVB Epoxy will withstand 12-14lbs of hydraulic pressure. Florida is known for seasonal moisture issues that occur. A Moisture Vapor Barrier as a primer is HIGHLY recommended in order to prevent stains of moisture underneath the coating.
4) Full Flake
5) Scrape
6) Polyaspartic top coat - Simiron Polyaspartic HS
* All outdoor areas coated include an additive of Aluminum Oxide for enhanced "Anti Slip" Resistance*
7)15 year warranty
$2,700.00 - 2 Day- claim MVB makes it a 2 day project
1) Diamond Grinding & Prepping
2) Repair.
3) Apply MVB
4) Polyurea Base/Primer
5) Full Flake
7) Polyaspartic top coat
8)Lifetime warranty
First guy is saying 1 day is fine. second guy is saying MVB always requires 2 days. One can start next week. Two needs a month because of the 2 day issue. Two is also saying polyurea base is better.