Help with epoxy process

Chaddo1973

New member
Joined
Jan 13, 2015
Messages
4
Hey , Doing my garage in epoxy flake and just curious as I am doing a boxed in 3 foot grade beam or stub wall as some call it and also want it rounded at bottom so that it’s seamless , as well as the floor. What do I do first the cove or the grade beam and cove or the floor ? Could I get away with just doing the grade beam and cove one day and flaking etc and then clean up and then do floor. Small crew so trying to figure this out
 
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!

Armorpoxy

Well-known member
Joined
Aug 18, 2013
Messages
3,735
Location
NJ
Hi,
If you desire a 1/4 round cove this should be installed prior to coating the floor,that way when you coat the floor it will be seamless going over the cove and up the wall.

We carry special Cove Mortar and curved Cove tools to facilitate this.
 