Chaddo1973
New member
- Joined
- Jan 13, 2015
- Messages
- 4
Hey , Doing my garage in epoxy flake and just curious as I am doing a boxed in 3 foot grade beam or stub wall as some call it and also want it rounded at bottom so that it’s seamless , as well as the floor. What do I do first the cove or the grade beam and cove or the floor ? Could I get away with just doing the grade beam and cove one day and flaking etc and then clean up and then do floor. Small crew so trying to figure this out
