signcrafter
Well-known member
- Joined
- May 9, 2012
- Messages
- 12,657
Got my ballast bypass led bulbs and now need to start redoing all my lights. I have a bunch of 2x4 fluorescent fixtures I'm going to use. Will just screw them to ceiling. My garage is all drywall or USB so everything will be surface mounted.
Should I do everything in 1/2" conduit from fixture to fixture? Or run conduit on the walls to a junction box and then a small whip of metal flex to each fixture? Or just metal flex from light to light, not sure if surface mounting flex is up to code or not? I probably have everything to do it whichever way so price isnt really a factor. Just wondering what the best or right way to do it is? Thanks.
Should I do everything in 1/2" conduit from fixture to fixture? Or run conduit on the walls to a junction box and then a small whip of metal flex to each fixture? Or just metal flex from light to light, not sure if surface mounting flex is up to code or not? I probably have everything to do it whichever way so price isnt really a factor. Just wondering what the best or right way to do it is? Thanks.