Hi all,
I had a concrete slab poured for a 30x30 building that will be going up shortly. The slab is a minimum of 4" thick, with some areas being as thick as 6-8". Since the day the slab was poured here in North TX we have had consistently been over 100F, dry and windy conditions (like a heat gun) in the daylight hours and only getting as low as 82F or so during the evening hours. I am wanting to apply a polyaspartic (possibly armorpoxy) coating. How long should I wait before using this application? Can it be applied before the building goes up? Thanks in advance for any help.
I had a concrete slab poured for a 30x30 building that will be going up shortly. The slab is a minimum of 4" thick, with some areas being as thick as 6-8". Since the day the slab was poured here in North TX we have had consistently been over 100F, dry and windy conditions (like a heat gun) in the daylight hours and only getting as low as 82F or so during the evening hours. I am wanting to apply a polyaspartic (possibly armorpoxy) coating. How long should I wait before using this application? Can it be applied before the building goes up? Thanks in advance for any help.