I began finishing my lower garage about a year ago, and decided (wrongfully) to finish the walls, which are poured concrete, with 2" XPS foam boards, followed by 2x4's installed flat. This has proved to be the worst decision, but I'm slowly finishing the walls.
Here is a pic to give you an idea:
Now, I arrive at the installation of electrical. Obviously, I want to be within code, so I have a few options here. I'm also aiming to add an additional 1.5" of foam board between the studs for additional insulation, so this complicates things.
1. Route/notch studs and run plates. My only problem is I'm having a hard time finding 3.5" plates, plus the outside/inside corners would be difficult to say the least.
2. An electrician that I use for some of my rentals said I could bore a hole through the foam behind the studs. The problem with this is securing the wire between the studs. I was thinking using the router and making a groove in the foam board, and running duct tape over it to hold it back so the foam board lays flat.
3. Run all metal conduit down/alongside the studs. Other than using more wire ( I'd go up the wall, across the ceiling, and down the next to the next box ), this might be the safest option?
I know I screwed up doing the walls like this. I should have built a traditional 2x stud wall.
Here is a pic to give you an idea:
Now, I arrive at the installation of electrical. Obviously, I want to be within code, so I have a few options here. I'm also aiming to add an additional 1.5" of foam board between the studs for additional insulation, so this complicates things.
1. Route/notch studs and run plates. My only problem is I'm having a hard time finding 3.5" plates, plus the outside/inside corners would be difficult to say the least.
2. An electrician that I use for some of my rentals said I could bore a hole through the foam behind the studs. The problem with this is securing the wire between the studs. I was thinking using the router and making a groove in the foam board, and running duct tape over it to hold it back so the foam board lays flat.
3. Run all metal conduit down/alongside the studs. Other than using more wire ( I'd go up the wall, across the ceiling, and down the next to the next box ), this might be the safest option?
I know I screwed up doing the walls like this. I should have built a traditional 2x stud wall.