Hi all - insulation question:
I'm building a 40x28 with 2 garage doors, 1 man-door and attic trusses with interior steps going up (L-shaped on the back and side wall with a landing). Will have a toilet/sink under steps downstairs and unfinished upstairs for the near future (several years at least). 12'+ ceilings and a 2-post lift.
I'm going to insulate since I need fixed heat for the water, so question:
If I insulate the ceiling above the garage but not the loft to start, can I add insulation above the loft later to condition that space in the event that we finish it at some future point?
What would you do?
I'm building a 40x28 with 2 garage doors, 1 man-door and attic trusses with interior steps going up (L-shaped on the back and side wall with a landing). Will have a toilet/sink under steps downstairs and unfinished upstairs for the near future (several years at least). 12'+ ceilings and a 2-post lift.
I'm going to insulate since I need fixed heat for the water, so question:
If I insulate the ceiling above the garage but not the loft to start, can I add insulation above the loft later to condition that space in the event that we finish it at some future point?
What would you do?
