I am helping my buddy with his steel garage build and the concrete guys followed the engineers plan for the 1st pour which are the perimeter walls and the crossers to tie the side walls together. At both entrances the wall has a 2" step down for the 14' door. The concrete guys said they would taper down the 4" thick main floor 2" at the door openings to meet the front and back entrance walls but I would rather have the floor flat all the way to the outside of the wall. My question is when we install the reinforcing wire mesh can we extend it to outside the wall say about 1ft and then when they pour the floor have it run all the way outside 2" thick? How do we prepare the floor that was poured last month to have the 2" top adhere without cracking later on? Thanks.