This is a photo of a job we were consulted on to rectify. 52,000 square feet U-store facility.
A customer applied a 2-layer epoxy system of epoxy and topcoat. Apparently this floor had a significant moisture issue in excess of 15 lbs/1000 sq ft/24 hrs and no remediation was performed, nor was the floor grinded or prepped properly.
Our Prep-Crete Surface Prep Division grinded it all off, then shot blasted it and applied a moisture barrier penetrating barrier, then re-applied our ArmorUltra coating system.
So, the lesson here is to always check for moisture, and prep properly and make sure you deal with people that know and understand coatings to give proper advice, and prevent potential problems.
A customer applied a 2-layer epoxy system of epoxy and topcoat. Apparently this floor had a significant moisture issue in excess of 15 lbs/1000 sq ft/24 hrs and no remediation was performed, nor was the floor grinded or prepped properly.
Our Prep-Crete Surface Prep Division grinded it all off, then shot blasted it and applied a moisture barrier penetrating barrier, then re-applied our ArmorUltra coating system.
So, the lesson here is to always check for moisture, and prep properly and make sure you deal with people that know and understand coatings to give proper advice, and prevent potential problems.