Hi Everyone,
I'm installing the interior skin on the walls of my pole building next week using the ribbed metal for the walls. I plan to run my electrical on the face of the walls in conduit and tie into the panel.
My panel is currently set into the wall cavity. Tomorrow I'm going to pull the meter and re-mount the panel. The question I have is when the guys install the metal on the walls will they **** up against the breaker panel or slide the metal behind the panel? I'm assuming with the ribbed sheathing that they'll **** up against the panel. I'm wondering if I should run plywood from the fur strip above the panel to the fur strip below the panel and mount the panel to the plywood or if I should mount the panel to the fur strips (2 x 4s) directly?
Just want to make sure that I have it framed and mounted properly before they start work on the walls.
Anyone have photos of how your box is mounted when you have the ribbed metal wall panels?
I'm installing the interior skin on the walls of my pole building next week using the ribbed metal for the walls. I plan to run my electrical on the face of the walls in conduit and tie into the panel.
My panel is currently set into the wall cavity. Tomorrow I'm going to pull the meter and re-mount the panel. The question I have is when the guys install the metal on the walls will they **** up against the breaker panel or slide the metal behind the panel? I'm assuming with the ribbed sheathing that they'll **** up against the panel. I'm wondering if I should run plywood from the fur strip above the panel to the fur strip below the panel and mount the panel to the plywood or if I should mount the panel to the fur strips (2 x 4s) directly?
Just want to make sure that I have it framed and mounted properly before they start work on the walls.
Anyone have photos of how your box is mounted when you have the ribbed metal wall panels?