iagsxr
Well-known member
Need to move my 1350 Macsimizer five blocks, full of tools, smaller top box(3/4 area of bottom).
Have a forklift.
Thinking of making a pallet type structure so don't bend the lower edges and just carrying it down the street.
Discuss, pointers, tips?
Oh and BTW this needs to happen tomorrow as expediently as possible.
Have a forklift.
Thinking of making a pallet type structure so don't bend the lower edges and just carrying it down the street.
Discuss, pointers, tips?
Oh and BTW this needs to happen tomorrow as expediently as possible.

