WS.6#384
Member
I have been saving for years, finally got it going. I plan on having a small kitchen area, that back section is a bathroom. The plumbing is just stubbed for now. I mean they did the plumbing in the foundation and stubbed it through, it is not tied in to septic system yet. If you are interested in this thread, it will be a slow process. But I will be updating pictures. I still am saving for driveway, so it will be a slow process. I am really happy with the way it has turned out so far. I still have to get electrical power and lighting. Tell me what you think.