leland331
New member
Hey everyone,
This is my first post so please forgive if it has been asked and answered a lot. I did my best to read and search beforehand.
I have a small Automotive shop area I am building on to the side of our main.. and very shadow filled shop. The additional area is 36x45' with 16' flat ceilings.
There will be one 10' overhead door in a corner that I will likely only have open during the bright day so as long as I don't suspend the lights too low above it, it shouldn't be a huge consideration. Ceiling will likely be bare drywall, walls will likely be white painted drywall, and the floor will be some type of sealed or painted concrete
I want to do the lighting properly from the start so that i do not have to redo it or wish i did something else after spending time and money.
I would go LED over fluorescent. I do have access to lots of 2 bulb 4' fixtures that I could easily pull the ballasts and retrofit if the retrofit bulbs would be bright enough to get me 80 ish foot-candles. But Visual Interior Tool wants like 50 fixtures.
Its probably been asked over and over, but what would you do? just trying to avoid wasted time and do this once.
This is my first post so please forgive if it has been asked and answered a lot. I did my best to read and search beforehand.
I have a small Automotive shop area I am building on to the side of our main.. and very shadow filled shop. The additional area is 36x45' with 16' flat ceilings.
There will be one 10' overhead door in a corner that I will likely only have open during the bright day so as long as I don't suspend the lights too low above it, it shouldn't be a huge consideration. Ceiling will likely be bare drywall, walls will likely be white painted drywall, and the floor will be some type of sealed or painted concrete
I want to do the lighting properly from the start so that i do not have to redo it or wish i did something else after spending time and money.
I would go LED over fluorescent. I do have access to lots of 2 bulb 4' fixtures that I could easily pull the ballasts and retrofit if the retrofit bulbs would be bright enough to get me 80 ish foot-candles. But Visual Interior Tool wants like 50 fixtures.
Its probably been asked over and over, but what would you do? just trying to avoid wasted time and do this once.