blackshadow
Member
- Joined
- Jul 14, 2007
- Messages
- 9
Hello garagefans, I have been following the posts and studying for a couple of years. Now, my foundation is laid and the post and beam structure will arrive Monday. I am off and away on the build, which I think will take 6-7months. The project is in Annapolis, MD and has a lift bay, a wash bay, 2 storage/parking bays, a workshop, a display area and a "studio" above. thanks for all the ideas. 

Attachments
Last edited: