Snip
Well-known member
Pole barn floor )40x66, 5" thick, 4k psi)was poured and smooth finished last friday then saw cut in aprox 10x10 squares. The shop has a 12x12 and a 10x10 R.O. for doors, not installed yet. The temp at pour time was around 50* and around 40* first night. The finisher did add calcium to each load. Around the same on Saturday. Sunday night it cooled off. Monday and Tuesday highs were above freezing but lows were around 20. So far I can see where the concrete has loosened its grip (shrunk slightly) around the perimeter boards but so far no cracks anywhere. Tomorrow it will be a week old. Generaly speaking what is the window of time to see cracks if I am going to see any?