Hi all, I've been lurking on this forum for a while now, getting all excited about jazzing up our garage! Finally got our own man cave!
For about 7 years me and a mate have struggled modifying and maintaining our cars on our driveways at home, just before last winter we were lucky enough to be able to borrow his grandparents double garage while they were out of the country for 6 months. That 6 months came and flew by leaving us with no place for his car, and no place to work on it. Not wanting to go back to working on the driveway we took the plunge and aquired ourselves a small unit.
After looking round for over a month we eventually found a place, about twice the size of most places we had seen, 2/3rds the price, and 5 mins walk from my house. WINNER!


Looking a bit dingy and unloved we set about clearing and painting it, dragging its sorry **** up to standard.



Once all the walls had been scrubbed and painted (twice) it was time to move onto flooring, I wanted either full ceramic tile job or epoxy coat, but budget dictates and we went for a decent quality but reasonably priced floor sealer / paint. After we'd swept ready for paint, I'm glad we did something with the flooring due to the amount of concrete dust!


That's as far as we have got, just waiting 24 hours then we can second coat the floor, then move onto the other side and repeat process. By Monday, (6 days from now) we plan to start moving our shelving, tools, spare parts, seating and sort out the lighting with a few extra strips.
I'll update when the flooring is completed and progress on our move-in.
Thanks for reading!
Jimmy
For about 7 years me and a mate have struggled modifying and maintaining our cars on our driveways at home, just before last winter we were lucky enough to be able to borrow his grandparents double garage while they were out of the country for 6 months. That 6 months came and flew by leaving us with no place for his car, and no place to work on it. Not wanting to go back to working on the driveway we took the plunge and aquired ourselves a small unit.
After looking round for over a month we eventually found a place, about twice the size of most places we had seen, 2/3rds the price, and 5 mins walk from my house. WINNER!


Looking a bit dingy and unloved we set about clearing and painting it, dragging its sorry **** up to standard.



Once all the walls had been scrubbed and painted (twice) it was time to move onto flooring, I wanted either full ceramic tile job or epoxy coat, but budget dictates and we went for a decent quality but reasonably priced floor sealer / paint. After we'd swept ready for paint, I'm glad we did something with the flooring due to the amount of concrete dust!


That's as far as we have got, just waiting 24 hours then we can second coat the floor, then move onto the other side and repeat process. By Monday, (6 days from now) we plan to start moving our shelving, tools, spare parts, seating and sort out the lighting with a few extra strips.
I'll update when the flooring is completed and progress on our move-in.
Thanks for reading!
Jimmy