this looks like a good value...
http://www.homedepot.com/Electrical...Id=10053&langId=-1&storeId=10051#.UKBi2IeACQk
and a stupid question here: do you need a secon(dary) load center for 220v?
i am planning on 5,possibly 6 receptacles for 220v and what looks like 2 dozen receptacles in shop...
learning as i go...and not wanting to kick myself once drywall is up.....i will also pre wire for 3 ceiling fans and a powdercoat oven (220v)
http://www.homedepot.com/Electrical...Id=10053&langId=-1&storeId=10051#.UKBi2IeACQk
and a stupid question here: do you need a secon(dary) load center for 220v?

i am planning on 5,possibly 6 receptacles for 220v and what looks like 2 dozen receptacles in shop...
learning as i go...and not wanting to kick myself once drywall is up.....i will also pre wire for 3 ceiling fans and a powdercoat oven (220v)