From memory the rules for direct burial electric are:
- 120V 20A or less gfi protected then as shallow as 12” inches (ie post light feed)
- conduit burial 18”
- direct burial 24”
I believe rigid conduit is 6", less under a slab. That's what I did and electrical inspector was fine. PVC maybe 12" ? I thought no conduit cable were 24" - that's what contractor told me, offering substantial savings if I dug it - 1200+ feet.