Well-known member
We recently moved into a new home with a single (attached) garage and had some sheds built at the back of the house to deal with this garage-downsizing. None of them have any electrical power and I'm looking to have a contractor come out and run power. I was wondering if I could please get some suggestions on circuits/amperage/subpanels from those who have done this before and maybe learned some lessons? I'm sure the contractor will have their own ideas, but I wanted to get your take.
My plan was to run power from main panel into Shed1, which is where I was thinking of placing my 220v air compressor (which will serve garage and sheds). It would be nice to have 110v for a couple of lights in here too. Power would then extend through Shed1 and then outside to Sheds 2 and 3. These sheds will just have 110v tools and some lighting. May run some landscape lighting off one of them too.
One thing I am unsure of is how much capacity there is on the main panel. We currently have a 100A service and I am guessing we may need to bump up to 200A with this addition.
My plan was to run power from main panel into Shed1, which is where I was thinking of placing my 220v air compressor (which will serve garage and sheds). It would be nice to have 110v for a couple of lights in here too. Power would then extend through Shed1 and then outside to Sheds 2 and 3. These sheds will just have 110v tools and some lighting. May run some landscape lighting off one of them too.
One thing I am unsure of is how much capacity there is on the main panel. We currently have a 100A service and I am guessing we may need to bump up to 200A with this addition.