RTcat
Well-known member
Ready to start putting in the drain pipe and stub for the two floor drains before concrete starts.
This detached work shop has no running water to it...and likely never will. Only reason I'm putting in floor drains is if I have to park a snow packed vehicle and want it to melt off over night before working on it and to drain the compressor. the 32 x 50 shop will have infloor radiant heat. The drain pipe will run to an outside trench drain of some sort. I will be putting traps on the two floor drains. Because of the low volume of water that will see this system:
Is 2" drain pipe sufficeint, or should I go with 3"?
TIA
This detached work shop has no running water to it...and likely never will. Only reason I'm putting in floor drains is if I have to park a snow packed vehicle and want it to melt off over night before working on it and to drain the compressor. the 32 x 50 shop will have infloor radiant heat. The drain pipe will run to an outside trench drain of some sort. I will be putting traps on the two floor drains. Because of the low volume of water that will see this system:
Is 2" drain pipe sufficeint, or should I go with 3"?
TIA
