I'm down to the short strokes on my garage reno, and I need help installing the wiring to the new subpanel in the (attached) garage. The question is this: I have a run of about twenty feet along one wall, but half is inside, half outside, exposed on both sides. I am using 2-2-2-4 Al SER in 1 1/4 EMT, and to go from the inside run to the outside run I am planning on using an LB (service entrance type) on each side of the wall joined by a ****** through the wall. The exterior EMT to LB connector will be watertight. The rest of the installation is pretty clear to me, but I'm just not sure about using LB's here.. Am I doing this right?