Looking at pouring the slab in the next week or two. I have a general question. First, I have about 10" of Washed Number 2 stones. I need to raise up the stone level and was going to have a few more tones of No. 1 Washed brought it. Next, I was going to lay down 2" of foam board, then lay the poly vapor film, then pour the pad (with rebar and pex tubing for floor heat). Does this sound like a good plane, or would you lay the vaopr barrier over the stones, then foam board and pour slab?
Not sure where to go with this. Any ideas?