MY 24x24 shop has (12) 4ft typical shop lights mounted in (6) groups of 2; essentially making (6) 8ft lights. They are starting to need ballasts and/or bulbs; only about 1/2 of them work at any given time. They also struggle to get going in the cold.
Is there a downside to removing them completely and instead installing your typical "light socket" and screw-in led light bulbs? i was thinking (12) 100watt equivilant led bulbs. the wiring is already there; the switches are already there; the ceiling is painted white to reflect light down; i do not have any type of height or hang-down issues
Is there a downside to removing them completely and instead installing your typical "light socket" and screw-in led light bulbs? i was thinking (12) 100watt equivilant led bulbs. the wiring is already there; the switches are already there; the ceiling is painted white to reflect light down; i do not have any type of height or hang-down issues