I have an extremely bumpie finish on my concrete floor! No cracks.
It is an old very slighty sloped garage floor sloping to the of center of the drive(40's cut). Size is of a car with access on both sides. I'm not trying to take out the slope.
I didn't notice the slope till a hurricane came though, it disappears at the garage door.
My problem is, I have an extremely rough finish, frankly it looks like it was done with a mop, not broom brushed. There is nothing smooth nor fine about.
Repouring the floor is really not the object, frankly it ain't going to happen...
Should I just consult a concrete man? I was frankly thinking of using a compactor on it just to knock some of it down/off, like a gravel compactor.
But this seems a little over the top...
I have some nice 2 x2 diamond plated rubber squares that I recycled off a job and want to install them. I don't mine the work, The works on me, and I'm not a scared. I frankly don't know what to use to level out this bumpie mass.
Can one do two passes with a leveling compound? I'm frankly thinking that it's that bad. My thoughts are that I can get a better finish of course but also I don't want to use a drum of glue as a filler as the rubber mat will reflect what's underneath.
Any advice other wise?
Thanks in advance.
It is an old very slighty sloped garage floor sloping to the of center of the drive(40's cut). Size is of a car with access on both sides. I'm not trying to take out the slope.
I didn't notice the slope till a hurricane came though, it disappears at the garage door.
My problem is, I have an extremely rough finish, frankly it looks like it was done with a mop, not broom brushed. There is nothing smooth nor fine about.
Repouring the floor is really not the object, frankly it ain't going to happen...
Should I just consult a concrete man? I was frankly thinking of using a compactor on it just to knock some of it down/off, like a gravel compactor.
But this seems a little over the top...
I have some nice 2 x2 diamond plated rubber squares that I recycled off a job and want to install them. I don't mine the work, The works on me, and I'm not a scared. I frankly don't know what to use to level out this bumpie mass.
Can one do two passes with a leveling compound? I'm frankly thinking that it's that bad. My thoughts are that I can get a better finish of course but also I don't want to use a drum of glue as a filler as the rubber mat will reflect what's underneath.
Any advice other wise?