I installed a grounding system on my building, probably overkill but it's the way I wanted it. Anyway I used an Ufer ground with the re-bar in my footing, and also used the 2, 8' ground rods. Strange thing is the Ufer ground only requires a #4 copper wire to it, my grounding conductor for my panel required #00 copper. It seemed to be a waste to run that over to the little #4 for the ufer ground so I used the #00 stuff to the rods and then on to the Ufer where I crimped it to the smaller stuff. I also used the #00 to bond the steel building frame to the system. I used a 1/4" X 1.5" X 6" plate to attach the bonding conductor to the steel and bolted it to a girt attachment at the main frame, then I spot welded the nuts so it could not be removed ( required so I could bury it in the wall ). All the connections were hydraulically crimped to the rods, re-bar, taps and the terminal that attached to the bonding "plate". William....