Spudland_Dave
Well-known member
Was just thinking about my Heat Pump/Mini-Split install at lunch... Going from memory, I know I'm running low on free space, so the thought crossed my mind, maybe I should install another panel now while I can.
The topic of adding a sub has been beat to death when they are located in another building (seperate ground rods, dont bond chassis...same when adding a sub panel to a sub panel)...but are there any differences when your adding a panel RIGHT next to the main? Plastic Conduit OK? Must use Metal? bond or dont bond?
The topic of adding a sub has been beat to death when they are located in another building (seperate ground rods, dont bond chassis...same when adding a sub panel to a sub panel)...but are there any differences when your adding a panel RIGHT next to the main? Plastic Conduit OK? Must use Metal? bond or dont bond?