MitchellL
Member
Here is my dilemma. Because of rushed design and not so great planning, My fault, and poor execution by contractor, Im not taking all the blame. The service door was set a little too close to the front wall. You can see my conduit in there with the one outlet right of the door. Thats where I wanted the sub-panel to go. But with the in swing door, I don't think the code would be pleased. I have a 6 slot panel, I need 2 240V, one for an EV, and one for welder, and 2 120 V runs for outlets and lights.
One option if it would please the inspector, is to put a cut off switch on top of the conduit, then run the mains from there up and over the door to the sub-panel so it has proper clearance.
Another option is throw the panel I have out and get a real service panel, and then convert the service door to an out swing. that would open that corner for the clearance in front of the panel.
My understanding is the cut-off has to be where the power enters the building, and can't have any splices. This is a detached garage. I already bought the service wire cut to length for a possible 100 amps. When I layed out the conduit, 2", I was looking at copper wire prices. I ended up buying aluminum.
Any other ideas? I can't find any clearance info for the cutoff switch or the max distance to the panel, so would option 1 be ok, the door between the cutoff and the sub panel?
Thanks
One option if it would please the inspector, is to put a cut off switch on top of the conduit, then run the mains from there up and over the door to the sub-panel so it has proper clearance.
Another option is throw the panel I have out and get a real service panel, and then convert the service door to an out swing. that would open that corner for the clearance in front of the panel.
My understanding is the cut-off has to be where the power enters the building, and can't have any splices. This is a detached garage. I already bought the service wire cut to length for a possible 100 amps. When I layed out the conduit, 2", I was looking at copper wire prices. I ended up buying aluminum.
Any other ideas? I can't find any clearance info for the cutoff switch or the max distance to the panel, so would option 1 be ok, the door between the cutoff and the sub panel?
Thanks