Hi Guys
Currently I have a 100A Stab Loc panel in the garge (Federal Pioneer) with only one breaker position free. In order to accomidate the added circuits for the garage and also furture expansion I am going to upgrade the existing pannel to a 42 position 200A pannel. The meter is rated for 200 A but the service wire is 2 AWG aluminum so I beleive that well need to be upgraded as it does not have the required ampacity for the new panel.
My questions are:
- Does the ground wire need to be upgraded along with the service feed. This is the wire the goes from the panel to the the actual ground.
- If I was to run a 60A sub in the basement at a later date but run the feed now what AWG would be appropriate. 8/3?
This is for a house located in BC Canada if it makes a difference.
Thanks
Dave
Currently I have a 100A Stab Loc panel in the garge (Federal Pioneer) with only one breaker position free. In order to accomidate the added circuits for the garage and also furture expansion I am going to upgrade the existing pannel to a 42 position 200A pannel. The meter is rated for 200 A but the service wire is 2 AWG aluminum so I beleive that well need to be upgraded as it does not have the required ampacity for the new panel.
My questions are:
- Does the ground wire need to be upgraded along with the service feed. This is the wire the goes from the panel to the the actual ground.
- If I was to run a 60A sub in the basement at a later date but run the feed now what AWG would be appropriate. 8/3?
This is for a house located in BC Canada if it makes a difference.
Thanks
Dave