reader2580
Well-known member
I planning ahead to replace my service after the 2020 NEC goes into effect in Minnesota probably by Oct 1st. (Was planned for July 1st, but COVID delayed it.)
I have attached a line diagram of what I want to do and I am wondering if it is code legal? Basically, installing a 200 amp meter base with 200 main breaker and having that breaker feed both my main panel / load center and a sub panel. (Yes, main panel needs a four wire feed.) I would do a tap for the sub panel with Polaris type connectors after the main breaker.
Ignore the typo in the drawing that I couldn't figure out how to fix.
I have attached a line diagram of what I want to do and I am wondering if it is code legal? Basically, installing a 200 amp meter base with 200 main breaker and having that breaker feed both my main panel / load center and a sub panel. (Yes, main panel needs a four wire feed.) I would do a tap for the sub panel with Polaris type connectors after the main breaker.
Ignore the typo in the drawing that I couldn't figure out how to fix.