To avoid these ads, REGISTER NOW!

Part II- Let me framing begin

KMR Construction

Well-known member
Joined
Oct 20, 2008
Messages
162
Location
Newport RI
So after recooping from the site work side of the project its time to start on the framing. I am a contractor and have alot of friends in the field. Called in the troops and a couple favors and in a weekend got the walls up, beam set and 1/2 the floor framed. Check out the progress













 
Last edited:
To avoid these ads, REGISTER NOW!

1969

Well-known member
Joined
Jan 8, 2010
Messages
1,412
Location
East Coast
It appears you are framing a 2nd floor..... correct ? If so , what will this be used for ?BTW, looks good.
 
OP
K

KMR Construction

Well-known member
Joined
Oct 20, 2008
Messages
162
Location
Newport RI
As far as the town knows "storage". But I think I will store a pool table and 60" tv up there. Its 24x30 with a 10 pitch roof. There will be a shed dormer on the right side.
 
To avoid these ads, REGISTER NOW!

Motown 454

Well-known member
Joined
Sep 25, 2008
Messages
1,359
What size is this garage? If I'm not being too nosey how much did the foundation cost you? It looks like its going up great.
 
OP
K

KMR Construction

Well-known member
Joined
Oct 20, 2008
Messages
162
Location
Newport RI
What size is this garage? If I'm not being too nosey how much did the foundation cost you? It looks like its going up great.

Wayne, The garage is 24x30, 10' 2x6 studs which puts the ceilling height at around 11' +/-. Where in SE MA are ya? Scott from Short Pour foundations did it, he does all my concrete work. I think it was $3800 if I remember correctly.
 

Motown 454

Well-known member
Joined
Sep 25, 2008
Messages
1,359
I'm in Fall River. I called him to get a price and he never got back to me. I'll have to try again. Thanks. Like everyone else I'm on a tight budget. How tall were the walls including the footing? Did you do your own excavating and back fill? Mine is smaller and only 3 sides plus an 8' section its attached to house.
 
OP
K

KMR Construction

Well-known member
Joined
Oct 20, 2008
Messages
162
Location
Newport RI
I did my own excavation due to having friends with equiptment. The walls are 10'6" tall plus the slab is set 6-9" down from there. Send me an email with your info and I will have Scott call ya. Also if you are looking to hire any of it out let me know I will be happy to give you some pricing.

[email protected]
 
OP
K

KMR Construction

Well-known member
Joined
Oct 20, 2008
Messages
162
Location
Newport RI
Started on the roof framing this weekend. Framed the gable walls then stood them up. Ridge is 2x12 rafters are 2x10. There will be a 3 pitch dormer on one side.






 
To avoid these ads, REGISTER NOW!
Top Bottom