Okay so I got the shop crane thats 2 ton. I need to lift more than 2 ton. Closer to 5k but only 2 in off the ground and it's got a flat bottom so it's not going to tip or anything. If this was something like an engine or a odd shape item that may roll, I wouldn't do it.
What is the weak points to the shop cranes? I've seen them Buckle right over top of the ram, but where else? Seems like very little material holding the feet pins in place. I'll update with pic.
I welded plates onto the end of the tube so far. Changed most of the bolts (will change all) to grade 8.
Some of the welds I could see porosity, so I will grind a notch in them and run a better bead.
Cut off 2 section of 4 links of g70 chain and fixed to 4 ton swivel hook
Thinking of running quarter inch plate down the length of the Boom basically sandwiching the non-adjustable boom section. Will have to drill holes for the adjustment arm.
What is the weak points to the shop cranes? I've seen them Buckle right over top of the ram, but where else? Seems like very little material holding the feet pins in place. I'll update with pic.
I welded plates onto the end of the tube so far. Changed most of the bolts (will change all) to grade 8.
Some of the welds I could see porosity, so I will grind a notch in them and run a better bead.
Cut off 2 section of 4 links of g70 chain and fixed to 4 ton swivel hook
Thinking of running quarter inch plate down the length of the Boom basically sandwiching the non-adjustable boom section. Will have to drill holes for the adjustment arm.
Attachments
Last edited: