I plan to put 2" foam on the walls and roof, then tin over, along with a pitched roof. Sort of using the box as the frame for a shed.
The connex has fiberglass walls which are somewhat insulated, but none of the 6 corners are. Just steel direct path to outside.
thought.for the floor is 2" foam, then plywood over top.
It needs to hold about 5000lbs in 2 300 gallon totes though.
Has to stay warm as the boiler will be in there. Will run glycol in it, but still. At least 40-50* when it might be -20* outside.
The connex has fiberglass walls which are somewhat insulated, but none of the 6 corners are. Just steel direct path to outside.
thought.for the floor is 2" foam, then plywood over top.
It needs to hold about 5000lbs in 2 300 gallon totes though.
Has to stay warm as the boiler will be in there. Will run glycol in it, but still. At least 40-50* when it might be -20* outside.