nadogail
Well-known member
Made the last electrical connections before testing and putting the cover on the receptacle box and energizing the saw.
If the motor runs and the magic smoke doesn’t leak out then I will call the job a success.
If the motor runs and the magic smoke doesn’t leak out then I will call the job a success.

Rust and seized "everything" made the job extra ******. Oh joy.



















