I’m planning to have a masonry wall built off of my enclosed patio to surround my hot tub (in central Oklahoma). The plan is to have the Wall in an L shape, going 3 feet off the patio and then going 20 feet until it meets a 3 feet retaining wall. The plan that I have developed with the mason is to do a standard CMU concrete block with brick overlying the block on the side that faces my hot tub.
At first, my mason wasn’t specific about the footing, but I told him that I wanted it to be 24 inches wide and at least 18 inches deep. He is fine with that. His plan is to have rebar coursing horizontally through the footing with vertical rebar coursing out of the footing into the hollow part of the block. I’m concerned because his plan is to use an electric mixer to mix bags of concrete to make the footer. By my calculations, that will be at least 110 bags of concrete needed. It worries me that he may not be able to do it quick enough to have a quality foot or poor. Maybe my fears aren’t justified. He has built a wall for a friend and she was very happy with his work.
If we were to do Ready mix that might be a little difficult or expensive. The pool build has required a pumper for everything, because it’s probably 150 to 200 feet from the street.
Any input would be appreciated.
At first, my mason wasn’t specific about the footing, but I told him that I wanted it to be 24 inches wide and at least 18 inches deep. He is fine with that. His plan is to have rebar coursing horizontally through the footing with vertical rebar coursing out of the footing into the hollow part of the block. I’m concerned because his plan is to use an electric mixer to mix bags of concrete to make the footer. By my calculations, that will be at least 110 bags of concrete needed. It worries me that he may not be able to do it quick enough to have a quality foot or poor. Maybe my fears aren’t justified. He has built a wall for a friend and she was very happy with his work.
If we were to do Ready mix that might be a little difficult or expensive. The pool build has required a pumper for everything, because it’s probably 150 to 200 feet from the street.
Any input would be appreciated.