I installed the new 3 bbl fermenter in the fermenter hall today. Some fiddle-fartin' around getting the little fellow transferred from the wood pallet it arrived on to a plastic pallet--which we'll be leaving it on, as it's missing the leveling pads and it'll be easier to level the pallet than the footless legs. Used a couple 3' pieces of 4X4 as the legs were just the perfect spacing to not allow a pallet jack or forklift forks to fit in between.
That did the job. Used a pallet jack to get it into the ferm hall and placed where we wanted it.
Now I need to plumb it in and make up a temp controller for it. I'm pretty sure there's a spare Johnson A419 out in the container....
Yep. But it was last used in the kitchen and the kitchen staff can be rough on things.
That will be difficult to render drip-proof. I also had a couple of 24V A419s, but no 24 V power supply and no 24V coils for the Asco Red Hat solenoid I wanted to use.
Brain transplant time!
The operation was a success.
The brains from the case donor:
Installed:
Ooh! Look at the cute bebe fermenter!